Grosvenor Lane, Neutral Bay

Sector:
Government
Project:
Infrastructure

Three traffic options modelled to resolve a Neutral Bay safety issue

Grosvenor Lane, Neutral Bay

The brief came from North Sydney Council to assess three options for changing the traffic configuration along Grosvenor Lane between Ben Boyd Road and Young Street in Neutral Bay, Sydney. Current and potential traffic conditions were assessed for each alternative using Intersection Modelling and Swept Path Feasibility Assessment. The work helped Council determine the right course of action to resolve community safety and transport concerns.

•
Traffic Impact Assessment
•
Intersection Modelling

See more of our projects

HD18, Honeysuckle Drive, Newcastle

Traffic and parking assessment for the HD18 mixed use development on Honeysuckle Drive in Newcastle. Reduced visitor parking secured along with an agreed access arrangement close to Newcastle harbour. The development has since progressed to construction.

New Space, Newcastle

Transport assessment for the University of Newcastle's new CBD campus at New Space. Below-DCP parking supply justified for a state significant development catering for 4,000 students and staff in the Newcastle city centre.

Philter Brewing, Marrickville

Green Travel Plan for Philter Brewing on Sydenham Road in Marrickville, Sydney. Sustainable transport alternatives identified for staff, reducing private vehicle use and supporting increased patronage through the DA process.

Greta Residential Development

Traffic assessment for a residential subdivision in Greta in the Hunter Region. No road upgrades required after the Hunter Expressway opened, saving the developer the cost of installing new traffic signals.

Lakeside Shopping Centre, The Entrance

Traffic assessment for the upgrade of Lakeside Shopping Centre at The Entrance on the Central Coast of NSW. New retail, tourist and conference facilities supported with improved road and bus access following consultation with Council and the RMS.

Regional Rail Dubbo Maintenance Facility

Pre-opening road safety audit for the Regional Rail Dubbo Maintenance Facility in Dubbo, NSW. Pedestrian hazards at footpaths and crossing points identified before the facility commenced operations.

Woolworths Distribution Centres, Moorebank

Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Commuter Car Parks for Train Stations, Sydney

Network-wide traffic study for new commuter car parks across the Sydney train network. Road network impacts, data collection and pedestrian connectivity assessed at each proposed site across NSW.

Bathers Way, Newcastle

Traffic, parking and pedestrian review for the Bathers Way coastal walking track in Newcastle. Intersection upgrade options were assessed at multiple locations to maintain road safety and keep delays to a minimum.

Highview Estate, Jindabyne

Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.