The brief came from North Sydney Council to assess three options for changing the traffic configuration along Grosvenor Lane between Ben Boyd Road and Young Street in Neutral Bay, Sydney. Current and potential traffic conditions were assessed for each alternative using Intersection Modelling and Swept Path Feasibility Assessment. The work helped Council determine the right course of action to resolve community safety and transport concerns.
Grosvenor Lane, Neutral Bay
Project Overview
Three traffic options modelled to resolve a Neutral Bay safety issue

SECA projects
See more of our projects

HD18, Honeysuckle Drive, Newcastle
Traffic and parking assessment for the HD18 mixed use development on Honeysuckle Drive in Newcastle. Reduced visitor parking secured along with an agreed access arrangement close to Newcastle harbour. The development has since progressed to construction.

Sydney Metro Chatswood Dive Site
Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

Woolworths Distribution Centres, Moorebank
Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Greta Residential Development
Traffic assessment for a residential subdivision in Greta in the Hunter Region. No road upgrades required after the Hunter Expressway opened, saving the developer the cost of installing new traffic signals.

Bathers Way, Newcastle
Traffic, parking and pedestrian review for the Bathers Way coastal walking track in Newcastle. Intersection upgrade options were assessed at multiple locations to maintain road safety and keep delays to a minimum.

Mogo Public School Parking
Car park feasibility study for Mogo Public School on the South Coast of NSW following the 2020 bushfires. Two off-street parking designs provided to improve safe access for students, teachers and parents.

Hexham Train Support Facility
Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

Philter Brewing, Marrickville
Green Travel Plan for Philter Brewing on Sydenham Road in Marrickville, Sydney. Sustainable transport alternatives identified for staff, reducing private vehicle use and supporting increased patronage through the DA process.

100 Bayswater Road, Rushcutters Bay
Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

New Space, Newcastle
Transport assessment for the University of Newcastle's new CBD campus at New Space. Below-DCP parking supply justified for a state significant development catering for 4,000 students and staff in the Newcastle city centre.