The ongoing development of the Bathers Way walking track along the Newcastle coastline required traffic review at a number of locations. SECA assessed traffic, parking and pedestrian impacts at each site and identified intersection upgrade options to maintain road safety and minimise delays for existing road users across the Newcastle road network.
Bathers Way, Newcastle
Project Overview
Safer access along Newcastle's coastal walking track.

SECA projects
See more of our projects

Sydney Metro Chatswood Dive Site
Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

Regional Rail Dubbo Maintenance Facility
Pre-opening road safety audit for the Regional Rail Dubbo Maintenance Facility in Dubbo, NSW. Pedestrian hazards at footpaths and crossing points identified before the facility commenced operations.

Philter Brewing, Marrickville
Green Travel Plan for Philter Brewing on Sydenham Road in Marrickville, Sydney. Sustainable transport alternatives identified for staff, reducing private vehicle use and supporting increased patronage through the DA process.

Lakeside Shopping Centre, The Entrance
Traffic assessment for the upgrade of Lakeside Shopping Centre at The Entrance on the Central Coast of NSW. New retail, tourist and conference facilities supported with improved road and bus access following consultation with Council and the RMS.

Grosvenor Lane, Neutral Bay
Traffic modelling and assessment for three configuration options along Grosvenor Lane in Neutral Bay, Sydney. Prepared for North Sydney Council to resolve community road safety and transport concerns in the area.

Highview Estate, Jindabyne
Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.

100 Bayswater Road, Rushcutters Bay
Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

Port of Newcastle
Road safety review of the private road network at Kooragang Island within the Port of Newcastle precinct. Control measures identified to address anti-social road behaviour that had persisted across the site for a number of years.

Woolworths Distribution Centres, Moorebank
Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Hexham Train Support Facility
Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.