Seca Solution completed a Pre-Opening Road Safety Audit for the Regional Rail Dubbo Maintenance Facility in Dubbo, New South Wales. The audit focused on pedestrian safety at footpaths and crossing points from the access road to the internal roads of the facility. Hazards and risks were identified for the client ahead of operations starting.
Regional Rail Dubbo Maintenance Facility
Project Overview
Pedestrian safety reviewed before the Dubbo facility opened

SECA projects
See more of our projects

Woolworths Distribution Centres, Moorebank
Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Bathers Way, Newcastle
Traffic, parking and pedestrian review for the Bathers Way coastal walking track in Newcastle. Intersection upgrade options were assessed at multiple locations to maintain road safety and keep delays to a minimum.

Philter Brewing, Marrickville
Green Travel Plan for Philter Brewing on Sydenham Road in Marrickville, Sydney. Sustainable transport alternatives identified for staff, reducing private vehicle use and supporting increased patronage through the DA process.

Highview Estate, Jindabyne
Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.

Hexham Train Support Facility
Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

Cooks Hill Traffic Study, Newcastle
Traffic study for Newcastle City Council reviewing controls through the Cooks Hill inner-city suburb. Options assessed to improve accessibility and parking for residents and the entertainment precinct without encouraging rat-running.

Commuter Car Parks for Train Stations, Sydney
Network-wide traffic study for new commuter car parks across the Sydney train network. Road network impacts, data collection and pedestrian connectivity assessed at each proposed site across NSW.

Lakeside Shopping Centre, The Entrance
Traffic assessment for the upgrade of Lakeside Shopping Centre at The Entrance on the Central Coast of NSW. New retail, tourist and conference facilities supported with improved road and bus access following consultation with Council and the RMS.

Sydney Metro Chatswood Dive Site
Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

New Space, Newcastle
Transport assessment for the University of Newcastle's new CBD campus at New Space. Below-DCP parking supply justified for a state significant development catering for 4,000 students and staff in the Newcastle city centre.