The upgrade of this landmark Central Coast shopping centre required traffic support for an expansion incorporating additional retail, tourist and conference facilities alongside improvements to the local road network and bus facilities. SECA undertook extensive surveys and road network modelling to plan effective access for all proposed uses. Consultation with Council and the RMS supported successful development approval.
Lakeside Shopping Centre, The Entrance
Project Overview
Central Coast shopping centre expanded with improved road access

SECA projects
See more of our projects

Sydney Metro Chatswood Dive Site
Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

Taronga Western Plains Zoo, Dubbo
Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Port of Newcastle
Road safety review of the private road network at Kooragang Island within the Port of Newcastle precinct. Control measures identified to address anti-social road behaviour that had persisted across the site for a number of years.

Woolworths Distribution Centres, Moorebank
Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Regional Rail Dubbo Maintenance Facility
Pre-opening road safety audit for the Regional Rail Dubbo Maintenance Facility in Dubbo, NSW. Pedestrian hazards at footpaths and crossing points identified before the facility commenced operations.

Greta Residential Development
Traffic assessment for a residential subdivision in Greta in the Hunter Region. No road upgrades required after the Hunter Expressway opened, saving the developer the cost of installing new traffic signals.

Bathers Way, Newcastle
Traffic, parking and pedestrian review for the Bathers Way coastal walking track in Newcastle. Intersection upgrade options were assessed at multiple locations to maintain road safety and keep delays to a minimum.

Grosvenor Lane, Neutral Bay
Traffic modelling and assessment for three configuration options along Grosvenor Lane in Neutral Bay, Sydney. Prepared for North Sydney Council to resolve community road safety and transport concerns in the area.

100 Bayswater Road, Rushcutters Bay
Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

Hexham Train Support Facility
Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.