The upgrade of this landmark Central Coast shopping centre required traffic support for an expansion incorporating additional retail, tourist and conference facilities alongside improvements to the local road network and bus facilities. SECA undertook extensive surveys and road network modelling to plan effective access for all proposed uses. Consultation with Council and the RMS supported successful development approval.
Lakeside Shopping Centre, The Entrance
Project Overview
Central Coast shopping centre expanded with improved road access

SECA projects
See more of our projects

Hexham Train Support Facility
Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

Philter Brewing, Marrickville
Green Travel Plan for Philter Brewing on Sydenham Road in Marrickville, Sydney. Sustainable transport alternatives identified for staff, reducing private vehicle use and supporting increased patronage through the DA process.

Highview Estate, Jindabyne
Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.

Taronga Western Plains Zoo, Dubbo
Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Sydney Metro Chatswood Dive Site
Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

Commuter Car Parks for Train Stations, Sydney
Network-wide traffic study for new commuter car parks across the Sydney train network. Road network impacts, data collection and pedestrian connectivity assessed at each proposed site across NSW.

100 Bayswater Road, Rushcutters Bay
Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

Cooks Hill Traffic Study, Newcastle
Traffic study for Newcastle City Council reviewing controls through the Cooks Hill inner-city suburb. Options assessed to improve accessibility and parking for residents and the entertainment precinct without encouraging rat-running.

Grosvenor Lane, Neutral Bay
Traffic modelling and assessment for three configuration options along Grosvenor Lane in Neutral Bay, Sydney. Prepared for North Sydney Council to resolve community road safety and transport concerns in the area.

Mogo Public School Parking
Car park feasibility study for Mogo Public School on the South Coast of NSW following the 2020 bushfires. Two off-street parking designs provided to improve safe access for students, teachers and parents.