Woolworths Distribution Centres, Moorebank

Sector:
Commercial and Industrial
Project:
Development

Traffic engineering certified for a national distribution centre in Sydney

Woolworths Distribution Centres, Moorebank

We were engaged by Richard Crookes Constructions to provide traffic engineering services across multiple stages of construction of Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Work included circulation and parking design assessment, signage and line marking plans, and issuing a traffic engineering occupation certificate. The outcome is a facility with safe and accessible parking and pedestrian facilities.

Heavy Vehicle Access Assessment
Vehicle Circulation Design
Parking Study
Signage and Line Marking
Occupation Certificate

See more of our projects

Port of Newcastle

Road safety review of the private road network at Kooragang Island within the Port of Newcastle precinct. Control measures identified to address anti-social road behaviour that had persisted across the site for a number of years.

Lakeside Shopping Centre, The Entrance

Traffic assessment for the upgrade of Lakeside Shopping Centre at The Entrance on the Central Coast of NSW. New retail, tourist and conference facilities supported with improved road and bus access following consultation with Council and the RMS.

100 Bayswater Road, Rushcutters Bay

Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

Cooks Hill Traffic Study, Newcastle

Traffic study for Newcastle City Council reviewing controls through the Cooks Hill inner-city suburb. Options assessed to improve accessibility and parking for residents and the entertainment precinct without encouraging rat-running.

Taronga Western Plains Zoo, Dubbo

Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Hexham Train Support Facility

Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

Greta Residential Development

Traffic assessment for a residential subdivision in Greta in the Hunter Region. No road upgrades required after the Hunter Expressway opened, saving the developer the cost of installing new traffic signals.

New Space, Newcastle

Transport assessment for the University of Newcastle's new CBD campus at New Space. Below-DCP parking supply justified for a state significant development catering for 4,000 students and staff in the Newcastle city centre.

Regional Rail Dubbo Maintenance Facility

Pre-opening road safety audit for the Regional Rail Dubbo Maintenance Facility in Dubbo, NSW. Pedestrian hazards at footpaths and crossing points identified before the facility commenced operations.

Sydney Metro Chatswood Dive Site

Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.