This mixed-use development on Honeysuckle Drive sits close to the Newcastle harbour foreshore and required careful consideration of access and parking to avoid costly basement construction. SECA secured approval with reduced visitor parking for both the commercial and residential components. An agreed access arrangement maximised site access with minimum impact on the surrounding Newcastle road network. The development has since progressed to construction.
HD18, Honeysuckle Drive, Newcastle
Project Overview
Reduced parking secured for a development near Newcastle harbour

SECA projects
See more of our projects

Lakeside Shopping Centre, The Entrance
Traffic assessment for the upgrade of Lakeside Shopping Centre at The Entrance on the Central Coast of NSW. New retail, tourist and conference facilities supported with improved road and bus access following consultation with Council and the RMS.

Philter Brewing, Marrickville
Green Travel Plan for Philter Brewing on Sydenham Road in Marrickville, Sydney. Sustainable transport alternatives identified for staff, reducing private vehicle use and supporting increased patronage through the DA process.

Taronga Western Plains Zoo, Dubbo
Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Highview Estate, Jindabyne
Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.

Sydney Metro Chatswood Dive Site
Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

Cooks Hill Traffic Study, Newcastle
Traffic study for Newcastle City Council reviewing controls through the Cooks Hill inner-city suburb. Options assessed to improve accessibility and parking for residents and the entertainment precinct without encouraging rat-running.

Woolworths Distribution Centres, Moorebank
Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Grosvenor Lane, Neutral Bay
Traffic modelling and assessment for three configuration options along Grosvenor Lane in Neutral Bay, Sydney. Prepared for North Sydney Council to resolve community road safety and transport concerns in the area.

New Space, Newcastle
Transport assessment for the University of Newcastle's new CBD campus at New Space. Below-DCP parking supply justified for a state significant development catering for 4,000 students and staff in the Newcastle city centre.

100 Bayswater Road, Rushcutters Bay
Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.