Highview Estate, Jindabyne

Sector:
Residential
Project:
Subdivisions and Rezoning

Full Jindabyne estate approved without new road connections

Highview Estate, Jindabyne

The approved masterplan for Highview Estate in Jindabyne required significant intersection upgrades and new road connections to accommodate the final release stages. SECA collected traffic data during the peak ski season to demonstrate that existing road connections had considerable spare capacity. The full development was approved to proceed within the existing road network, removing the requirement for additional road connections and delivering significant savings on infrastructure costs for the developer.

•
Traffic Impact Assessment
•
Intersection Modelling
•
Data Collection

See more of our projects

Woolworths Distribution Centres, Moorebank

Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Sydney Metro Chatswood Dive Site

Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

Mogo Public School Parking

Car park feasibility study for Mogo Public School on the South Coast of NSW following the 2020 bushfires. Two off-street parking designs provided to improve safe access for students, teachers and parents.

100 Bayswater Road, Rushcutters Bay

Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

Port of Newcastle

Road safety review of the private road network at Kooragang Island within the Port of Newcastle precinct. Control measures identified to address anti-social road behaviour that had persisted across the site for a number of years.

Grosvenor Lane, Neutral Bay

Traffic modelling and assessment for three configuration options along Grosvenor Lane in Neutral Bay, Sydney. Prepared for North Sydney Council to resolve community road safety and transport concerns in the area.

Bathers Way, Newcastle

Traffic, parking and pedestrian review for the Bathers Way coastal walking track in Newcastle. Intersection upgrade options were assessed at multiple locations to maintain road safety and keep delays to a minimum.

Hexham Train Support Facility

Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

Taronga Western Plains Zoo, Dubbo

Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Greta Residential Development

Traffic assessment for a residential subdivision in Greta in the Hunter Region. No road upgrades required after the Hunter Expressway opened, saving the developer the cost of installing new traffic signals.