Philter Brewing, Marrickville

Sector:
Commercial and Industrial
Project:
Development

Green Travel Plan reduces private car use at a Marrickville brewery

Philter Brewing, Marrickville

Philter Brewing appointed us to prepare a Green Travel Plan for the Sydenham Road site in Marrickville, providing sustainable transport alternatives for employees given limited off-street parking. Specific objectives and targets were identified based on employee residence patterns and willingness to use sustainable transport. Outcomes have included reduced private vehicle use and increased walking and cycling to the site.

Workplace Travel Plan
Green Travel Plan

See more of our projects

HD18, Honeysuckle Drive, Newcastle

Traffic and parking assessment for the HD18 mixed use development on Honeysuckle Drive in Newcastle. Reduced visitor parking secured along with an agreed access arrangement close to Newcastle harbour. The development has since progressed to construction.

Taronga Western Plains Zoo, Dubbo

Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Highview Estate, Jindabyne

Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.

Commuter Car Parks for Train Stations, Sydney

Network-wide traffic study for new commuter car parks across the Sydney train network. Road network impacts, data collection and pedestrian connectivity assessed at each proposed site across NSW.

Lakeside Shopping Centre, The Entrance

Traffic assessment for the upgrade of Lakeside Shopping Centre at The Entrance on the Central Coast of NSW. New retail, tourist and conference facilities supported with improved road and bus access following consultation with Council and the RMS.

Sydney Metro Chatswood Dive Site

Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

Grosvenor Lane, Neutral Bay

Traffic modelling and assessment for three configuration options along Grosvenor Lane in Neutral Bay, Sydney. Prepared for North Sydney Council to resolve community road safety and transport concerns in the area.

100 Bayswater Road, Rushcutters Bay

Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

Hexham Train Support Facility

Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

Mogo Public School Parking

Car park feasibility study for Mogo Public School on the South Coast of NSW following the 2020 bushfires. Two off-street parking designs provided to improve safe access for students, teachers and parents.