We completed a Pre-Construction and Detailed Design Road Safety Audits for the integration of a development driveway with the traffic signals at Bayswater Road and McLachlan Avenue in Rushcutters Bay, Sydney. Separate audits were completed on the traffic control signal design and the related traffic guidance scheme. The audit identified risks and treatment options related to sight limitations and delineation during construction.
100 Bayswater Road, Rushcutters Bay
Project Overview
Development driveway safely integrated with a Sydney signalised intersection

SECA projects
See more of our projects

Hexham Train Support Facility
Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

Woolworths Distribution Centres, Moorebank
Heavy vehicle access design, parking and vehicle circulation assessment for Woolworths Regional and National Distribution Centres at Moorebank in Sydney. Delivered by Seca Solution across multiple stages of construction.

Highview Estate, Jindabyne
Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.

Cooks Hill Traffic Study, Newcastle
Traffic study for Newcastle City Council reviewing controls through the Cooks Hill inner-city suburb. Options assessed to improve accessibility and parking for residents and the entertainment precinct without encouraging rat-running.

Greta Residential Development
Traffic assessment for a residential subdivision in Greta in the Hunter Region. No road upgrades required after the Hunter Expressway opened, saving the developer the cost of installing new traffic signals.

Commuter Car Parks for Train Stations, Sydney
Network-wide traffic study for new commuter car parks across the Sydney train network. Road network impacts, data collection and pedestrian connectivity assessed at each proposed site across NSW.

Regional Rail Dubbo Maintenance Facility
Pre-opening road safety audit for the Regional Rail Dubbo Maintenance Facility in Dubbo, NSW. Pedestrian hazards at footpaths and crossing points identified before the facility commenced operations.

Taronga Western Plains Zoo, Dubbo
Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Grosvenor Lane, Neutral Bay
Traffic modelling and assessment for three configuration options along Grosvenor Lane in Neutral Bay, Sydney. Prepared for North Sydney Council to resolve community road safety and transport concerns in the area.

Bathers Way, Newcastle
Traffic, parking and pedestrian review for the Bathers Way coastal walking track in Newcastle. Intersection upgrade options were assessed at multiple locations to maintain road safety and keep delays to a minimum.