Port of Newcastle

Sector:
Commercial and Industrial
Project:
Infrastructure

Road safety measures identified for the Port of Newcastle

Port of Newcastle

The Port of Newcastle operates an extensive private road network at Kooragang Island that carries a wide range of vehicles and users. Road safety had been an ongoing concern. SECA reviewed the road network to identify opportunities to address anti-social road behaviour that had persisted in the area for a number of years. The project identified permanent and temporary control measures with associated costs, allowing the Port to select options that fit within budget.

Traffic Study

See more of our projects

Sydney Metro Chatswood Dive Site

Pre-opening road safety audit for the Sydney Metro Chatswood Dive Site access road in Chatswood, NSW. Risks identified for pedestrians, cyclists and motorists before the new road connection between Nelson Street and Mowbray Road opened.

HD18, Honeysuckle Drive, Newcastle

Traffic and parking assessment for the HD18 mixed use development on Honeysuckle Drive in Newcastle. Reduced visitor parking secured along with an agreed access arrangement close to Newcastle harbour. The development has since progressed to construction.

Mogo Public School Parking

Car park feasibility study for Mogo Public School on the South Coast of NSW following the 2020 bushfires. Two off-street parking designs provided to improve safe access for students, teachers and parents.

Philter Brewing, Marrickville

Green Travel Plan for Philter Brewing on Sydenham Road in Marrickville, Sydney. Sustainable transport alternatives identified for staff, reducing private vehicle use and supporting increased patronage through the DA process.

Greta Residential Development

Traffic assessment for a residential subdivision in Greta in the Hunter Region. No road upgrades required after the Hunter Expressway opened, saving the developer the cost of installing new traffic signals.

Highview Estate, Jindabyne

Traffic assessment for Highview Estate in Jindabyne, NSW. Full development demonstrated to be achievable within the existing road network, removing the need for costly new road connections and saving significant infrastructure costs.

Taronga Western Plains Zoo, Dubbo

Traffic Impact Assessment and Intersection Modelling for the development of Taronga Western Plains Zoo in Dubbo, NSW. Delivered by Seca Solution for Taronga Conservation Society Australia.

Hexham Train Support Facility

Construction Traffic Management Plan for the Hexham Train Support Facility near Newcastle. High truck volumes managed safely on the New England Highway throughout the build in line with RMS requirements.

100 Bayswater Road, Rushcutters Bay

Pre-construction and design road safety audits at 100 Bayswater Road in Rushcutters Bay, Sydney. Driveway access integration with existing traffic signals audited at the Bayswater Road and McLachlan Avenue intersection.

New Space, Newcastle

Transport assessment for the University of Newcastle's new CBD campus at New Space. Below-DCP parking supply justified for a state significant development catering for 4,000 students and staff in the Newcastle city centre.